PROJECT 6211
PAGE UPDATED: JULY 16, 2009
This page chronicles the rehabilitation of ex-Boston & Maine Railroad Budd Rail Diesel Car #6211. The project is being carried out by the Town of Bedford with assistance from Friends of Bedford Depot Park. It is funded by the Community Preservation Act.


TASK |
STATUS |
|
| 1. | Clean and deliver ceiling panels to car; lay out inside car; determine quantity missing. |
done |
| 2. | Remove broken screws from window ledges. |
done |
| 3. | Secure/install ceiling mouldings. | done |
| 4. | Remove bathroom door and trim. | done |
| 5. | Remove and discard fiberglass duct piece. | done |
| 6. | Remove loose ladder rungs; reinstall just below number light. | done |
| 7. | Remove old air gauges; install new air gauges and false piping. | done |
| 8. | Free up controllers; lubricate with spray grease. | done |
| 9. | Install controller covers. | done
|
| 10. | Paint and install horns. | done |
| 11. | Install luggage racks. | done |
| 12. | Install radiator covers. | done |
| 13. | Install refurbished seats. | done |
| 14. | Hang ceiling panels. |
done |
| 15. | Lubricate door latches. | done |
| 16. | Install number boards. | done |
| 17. | Remove ceiling air registers. | done |
| 18. | Remove and paint vestibule light fixtures. | done |
| 19. | Remove the small window in side of car. | done |
| 20. | Remove marker light frames | done |
| 21. | Remove sliding window frame in side door | done |
| 22. | Remove air return register | done |
| 23. | Install electrical cabinet door locks |
done |
24. |
Install ceiling panels with restored air registers |
done |
25. |
Install side door drop sashes and replace rusted trim screws |
done |
26. |
Install trap door thresholds | - |
27. |
Install new window trim |
done |
28. |
Clean reflectors inside baggage rack brackets |
done |
29. |
Install replacement marker light lenses |
done |
30. |
Remove paint from baggage rack light lenses |
done |
31. |
Remove debris from inside car |
done |
32. |
Install baggage rack light lenses |
done |
| 33. | Paint air gauges | done |
34. |
Seal air ducts and ceiling trim with silicone |
done |
34. |
Prepare luggage rack brackets for installation of bracket adapters |
done |
34. |
Install alumninum wall panels in Baggage Compartment |
done |
34. |
Install luggage racks |
done |
34. |
Apply number board with JB Weld and screws |
done |
34. |
Vacuum electrical cabinets |
done |
34. |
Vacuum window sills |
done |
34. |
Vacuum vestibule light compartments |
done |
34. |
Vacuum vestibule floor crevices |
done |
34. |
Install engine compartment end cover |
done |
34. |
Install heat pump assembly |
done |
34. |
Install side door latches where needed |
done |
34. |
Install air filter pan |
done |
34. |
Install fuel filler |
done |
35. |
Install sound system |
done |
| Although the later stages of RDC 6211's renovation work has been performed by contractors and DPW workers, a significant portion of the overall project was done by local volunteers. We are grateful for the important help that was furnished these people. | |||||||||||||||
|
The more recent information is at the top of the list. Start at the bottom if you wish to review these items in sequence. Clicking on a link will open a snapshot inside a new pop-up browser window. New photos are added from time to time -- so do come back.